April 2008 - (in progress)
Construction of power plant with 4x 25 Megawatt turbines in the rhine river including excavation of the river bed and blasting of approx. 1.2 Mio m³ of hardrock. Claim consulting forcontractor; Judgement on technical and geotechnical claim potentials. In cooperation with Warning Bauconsult, Munich. Customer: Sprengarbeiten Flusskraftwerk Rheinfelden JV. |