Construction of a deep-sea port and two breakwaters; Two breakwaters (2,610 m/1,125 m long), in water depth of up to 16 m. Production and placing of about 26,800 dolosses, weighing 30 tons each. Dewatering an area of 300,000 m2 20 meters below water level for construction of the container and bulk cargo berths.
Geotechnical claim consultancy for rock drillability as employee of IFB Eigenschenk GmbH, Deggendorf.
Geotechnical on-site documentation, data analysis, reporting.
Customer: NHC - Ngqura Harbour Contractors (Hochtief Construction AG, CONCOR, NEC).
|
|