Dam construction in the course of a footwalk bridge across the B9 in Worms. Dam is constructed on mostly unconsolidated, holocene soils near the rhine river.
Geotechnical Installation and Measurements.
Instrumentation and periodical measurement of 2 horizontal inclinometer tubes (50 m and 36 m in length) in order to monitor settlements by use of horizontal inclinometers.
Customer: K.H. Gaul GmbH, Sprendlingen.
|