BBT exploratory tunnels (I)

October 2007 - November 2010

 

Exploratory tunnels Aica (TBM) and Mules (drill and blast method) for the main Brennero Base Tunnel.
Aica tunnel: 10.5 km, length WIRTH doubleshild TBM, diameter 6,3 m
Mules tunnel: 1.76 km, length, conventional drive, 92m² cross section
Geology: Brixen granite with shear- and fault zones

Responsible Manager for geotechnical monitoring in Construction Supervision.

Documentation, reporting and consulting on geotechnical monitoring.

Customer: BBT / Prof. Quick Ingenieure und Geologen GmbH, Darmstadt.

tbm aicha web