| Exploratory tunnels Aica (TBM) and Mules (drill and blast method) for the main Brennero Base Tunnel.Aica tunnel: 10.5 km, length WIRTH doubleshild TBM, diameter 6,3 m
 Mules tunnel: 1.76 km, length, conventional drive, 92m² cross section
 Geology: Brixen granite with shear- and fault zones
 Responsible Manager for geotechnical monitoring in Construction Supervision. Documentation, reporting and consulting on geotechnical monitoring. Customer: BBT / Prof. Quick Ingenieure und Geologen GmbH, Darmstadt. |